Kapisa Healthcare · Delhi NCR
Turnkey Hospital Projects - One Team. Complete Scope. From Design to Handover.
What Turnkey Means
What a Turnkey Hospital Project Actually Means
What's Included
Everything We Cover in a Turnkey Hospital Project
01
Hospital Space Planning & Layout
Department-by-department AutoCAD layout design - OT complex, CSSD, ICU, wards, pharmacy, diagnostics - with NABH zone requirements, patient flow, and infection control built in from day one.
02
NABH Compliance Planning
Full NABH accreditation gap analysis and infrastructure compliance planning - ensuring every zone, every finish, and every system meets accreditation requirements before a single brick is laid.
03
Modular OT Complex
Complete design and installation of your OT suites - laminar airflow, wall panels, surgical lighting, gas outlets, HVAC, and all documentation.
04
CSSD Design & Fit-Out
3-zone CSSD design, civil fit-out, equipment integration, and NABH documentation - managed as part of the overall project.
05
Medical Gas Pipeline System
Complete MGPS design and installation - manifold rooms, copper pipeline network, bedhead panels, alarm systems, and commissioning.
06
ICU & Critical Care Infrastructure
Full ICU bay setup - partitions, bedhead panels, pendants, nurse call, gas, HVAC, and lighting - for all ICU types required.
07
Hospital HVAC & Ventilation
Infection-control-grade HVAC for all clinical zones - OTs, ICUs, isolation rooms, NICUs, CSSDs, and wards - commissioned to NABH air change specifications.
08
Modular Wall Panels & Finishes
Hygienic panel systems, epoxy flooring, coved skirting, and clinical surface finishes throughout all critical zones of the hospital.
09
Project Management & Coordination
Dedicated project manager overseeing all disciplines, timelines, site safety, and quality control - with regular progress reporting to hospital management.
Where We Build
Cleanroom Applications - Healthcare & Pharmaceutical

New Hospital Builds
Investors, doctors, or hospital groups setting up a new private hospital or nursing home and need end-to-end infrastructure delivery with NABH accreditation in mind from the start.

Hospital Expansions
Existing hospitals adding a new OT complex, ICU wing, or CSSD to an existing facility - where coordination between the new work and live hospital operations must be tightly managed.

NABH Upgrade Projects
Hospitals approaching NABH accreditation for the first time, where multiple infrastructure upgrades - OT, CSSD, gas, HVAC - need to be delivered in a coordinated sequence.

Day Care Surgical Centre Setups
Day surgery and specialty centres that need a complete, compact, NABH-ready infrastructure setup delivered quickly and cost-effectively.
Our Process
How We Deliver a Turnkey
Hospital Project - Step by Step
01
Discovery & Project Brief
We meet with your team to understand the full project scope - hospital type, bed count, services required, NABH timeline, budget envelope, and any site constraints. We prepare a Project Brief for your review and confirmation.
02
Hospital Layout & Zone Design
Full hospital space planning and AutoCAD layout design - with every department, zone, and clinical area laid out to NABH requirements. Multiple layout options reviewed with your medical director and management team before finalisation.
03
Detailed Engineering Design
Detailed MEP, HVAC, medical gas, OT, CSSD, and ICU engineering drawings prepared by our in-house team - including services coordination to eliminate clashes and design conflicts before site work begins.
04
Procurement & Fabrication
All materials, panels, equipment, and systems are procured from approved suppliers, with full quality documentation. Modular components are fabricated to project-specific dimensions before site delivery.
05
Phased On-Site Installation
Installation is phased by zone and discipline - civil works first, then services, then fit-out - with a dedicated project manager coordinating all trades on-site and providing weekly progress reports to your team.
06
Commissioning & Testing
Every system - HVAC, medical gas, nurse call, electrical, OT laminar airflow - is individually commissioned and tested before overall project sign-off. All commissioning results are documented for NABH submission.
07
NABH Documentation & Handover
Complete NABH-ready documentation pack delivered at handover - as-built drawings for all systems, commissioning reports, material certificates, SOP templates, and maintenance manuals. Staff orientation sessions conducted for all key systems.
Frequently Asked Questions
Common Questions About
Turnkey Hospital Projects
Powered by MedGenz
Get Started
Planning a New Hospital or Upgrading Your OT?
- +91 80549 84719
- info@kapisahealthcare.com
- Plot No. 87, F/F Kh. No. 31/25, Behind Delhi Public School, Matiyala, Sector-3, New Delhi 110059